黃河龍口水利樞紐工程


       黃河龍口水利樞紐是黃河萬家寨水利樞紐的配套工程,位于黃河北干流托龍段尾部,壩址上游距萬家寨水利樞25.6km。工程任務以發電為主,同時對萬家寨水電站進行反調節。水庫總庫容1.96億m3,最大壩高51m,電站總裝機容量420MW,多年平均發電量13.02億kW·h,工程的建設投運對促進當地經濟社會的發展、改善生態環境將發揮重要作用。我們對有關砂石骨料、工程設計變更及優化、1~10#壩段及發電廠房基巖質量鑒定、調整概算報告審查、施工組織設計方案咨詢、水庫調度運用方案研討等進行了技術研究并提出科學的解決方案。

      The Yellow River Longkou Hydro-junction is a supporting project of the Wanjiazhai Hydro-junction of the Yellow River. It is located at the tail of the Toro Section of the main stream of the Yellow River. The upper reaches of the dam are 25.6km away from the Wanjiazhai Water Control Project. Engineering tasks to power generation, at the same time anti-regulation of Wanjiazhai hydropower station. With a total reservoir capacity of 196 million m3, a maximum dam height of 51 m, a total installed capacity of 420 MW and a multi-year average generating capacity of 1.30 billion kW · h, the construction and operation of the project will play an important role in promoting local economic and social development and improving the ecological environment. We conducted a technical study on gravel aggregates, engineering design changes and optimization, rock quality appraisal of 1 ~ 10 # dam sections and power plant buildings, review of budget estimates, consultation on construction organization design proposals, and study on reservoir operation and utilization plans. Put forward a scientific solution.



蜜芽成人网站在线观看